| Customization: | Available |
|---|---|
| Production Scores: | Single Variety |
| Production Continuity: | Continuous |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Capacity | 16 PPM | Battery | 100 AH/280 AH |
| Line Output | 4 GWH | Battery Voltage | 3.2V |
| Line Power | 160 KWH | Cell Dimension | 17.4* 12.8* 4.8 (cm) 20.5* 17.3*7.2 (cm) |
| Line Dimension | 93* 10* 4 (m) | CMK | ≥ 1.67 |
| Final Yield Rate | 99.8% | OEE | ≥ 85% |
| Line Electric Requirement | 160 KW | Package | Wooden case |
| Line Air Requirement | 30000 L/M |
| Module Part | |||
| 1 | Robot Automatically Feeding Statio | 2 | Robot Tranfer Station |
| 3 | OCV Thickness Test Station | 4 | Plasma Cleaning station |
| 5 | Cell NG Station | 6 | Gluing Station |
| 7 | Cell Stripe Glue Taping Station | 8 | End-plate Stripe Glue Taping Station |
| 9 | Side-plate Processing Station | 10 | Module Stacking Station |
| 11 | Automatic Riveting Station | 12 | Side-seam Welding Station |
| 13 | Static Storage Area | 14 | Insulation and without Voltage Test Station |
| 15 | CCS Laser Cleaning Station | 16 | Polar Addressing Station |
| 17 | CCS installation | 18 | CCS Welding Station |
| 19 | Post-welding Test Station | 20 | Communication Test Station |
| 21 | Hight and Weight Measure Station | 22 | Module Unloading |
| PACK Part | |||
| 1 | Water-cooling Plate Online | 2 | Module in PACK |
| 3 | Module Fixing | 4 | Copper Plate Connection |
| 5 | Low-voltage Applicant Installation | 6 | EOL Test Station |
| 7 | Charging and Discharging Test Station | ||
